Provide one additional electrical feature such as powered turnouts, signaling, turnout indication, lighted buildings, etc.ĭon't read more into this than is there.This means that as long as you can cut power to the sidings individually, you can run one train, park it on a siding while you run another, then park it and run the first again. Notice the option for a single track main with sidings. This requirement can also be easier than it sounds. All installed trackage must be properly wired so that two trains can be operated simultaneously (Double-track main, single-track main with sidings, block or command control, etc.).The purpose of this requirement is to show that you understand roadbed profile, drainage, etc. The "proper roadbed" requirement can be met by laying the track on a raised roadbed, ( such as cork ) and ballasting it. For example, just having three simple turnouts will qualify. Also, note that the three types DO NOT have to be different. "Types of trackage" can be just about anything: turnouts, crossings, and grade elevation (a change in elevation of the track) are all examples of "types of trackage". First, notice that last sentence about commercial trackage you don't have to hand-lay anything - you can just install a store bought turnout. This requirement sounds a lot harder than it is. All must be properly ballasted and installed on proper roadbed. Three (3) types of trackage are required (turnout, crossing, etc.).Things like bridges and trestles also fall into this category. Remember that "structures" aren't just buildings. Painting or weathering are good things to consider. The idea is to show that you can do more than glue a simple plastic kit together. The same comments apply here about the type of kits. These structures may be separate, or one or more of them may be part of a single scene. Construct five (5) structures (scratchbuilt, craftsman, or detailed and commercial kits).How much is 8 square feet of layout? Well, a typical module is 4 feet by 2 feet, and would easily satisfy this requirement. On the other hand, you may have trouble convincing someone that a loop of track nailed to a piece of green painted wood constitutes a "layout". Construct a minimum of eight (8) square feet of layout.Īgain, there is no requirement about how good or how elaborate your layout must be - just that you must "construct" it.Model Railroad Setting (Structures & Scenery).However, by painting and decaling it, adding a little detailing, perhaps some weathering, etc., you'll have a qualifying model in no time! For example, by itself a freight car kit straight out of the box, is not enough to qualify. These models need to show a little more effort than a "shake the box" kit. Even having them set out on your layout, or a table in your basement counts as "display"). ( In the monthly contests at your division meetings, for example. Nowhere does it say that they must earn a minimum number of points in judging - just that they must be displayed. Notice that the requirement is to "display" them.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |